Disgruntled Flynn has called in with news of ongoing disruption at Eccles Bus Interchange as Cadent make emergency repairs of a leaking gas pipe on Church Street. The work is causing delays on the network with some buses running up to 25 minutes behind schedule. It is unknown as to when the repair work will be concluded. Tony has told us his ability to eat pie a the Leaf Bean Pod has been badly affected so I am off to give him a lift.